Metro Weighs Fashion Square Lot for Sepulveda Subway Rail Yard
LA Metro is weighing five sites for a Sepulveda subway rail yard, including Westfield Fashion Square in Sherman Oaks. Final plans are two years off.
Last verified · How we report · Report a correction

- Source Briefing
- Public record
- Also reported by FOX 11 Los Angeles
LA Metro is weighing Westfield Fashion Square in Sherman Oaks as one of five possible sites for a rail yard serving the Sepulveda Transit Corridor subway, according to FOX 11 Los Angeles. No site has been chosen.
What it changes for a developer: a rail yard on or beside Westfield Fashion Square would put a large transit industrial use next to one of the Valley’s main retail and mixed-use corridors, so owners and builders nearby should track which site Metro picks.
The news that moved today. Free email. Every weekday morning.
Why it matters
LA Metro is weighing five possible sites for the train maintenance and storage facility that the Sepulveda Transit Corridor subway would need, according to FOX 11 Los Angeles. One option is Westfield Fashion Square in Sherman Oaks. The station reported the location along Oxnard Street between Kester Avenue and Sepulveda Boulevard.
Metro’s own project page says the project would require a maintenance and storage facility, with several location options still to be evaluated. It does not name the sites. No site has been chosen.
Hundreds of residents came to a Monday meeting at the Sherman Oaks East Valley Adult Center, FOX 11 reported. Metro ran two back-to-back presentations because the room was over capacity. Residents raised noise and property values, and the station said no time was set aside for public comment. A Metro spokesperson told the station the agency is “really early in the process.”
See more on Los Angeles infrastructure and development.
The numbers
- Sites under review: five, per FOX 11.
- Project cost: about $25 billion, a figure FOX 11 used. Metro’s page lists no total cost.
- First operating segment: about 8.4 miles, Wilshire/Westwood to G Line/Van Nuys, per Metro.
- Metro’s Board chose the Locally Preferred Alternative in January 2026.
What’s next
FOX 11 reported that Metro expects settling the plans to run as long as two years, and that the trains will be electric. Metro still has to narrow the list of yard sites and take public comment. Developers and property owners near the candidate sites should watch for the formal site analysis.
Quick answers
- What is the latest on LA Metro in Los Angeles?
- LA Metro is weighing five sites for a Sepulveda subway rail yard, including Westfield Fashion Square in Sherman Oaks. Final plans are two years off.
- What are the key numbers for LA Metro?
- candidate yard sites: 5; first operating segment: 8.4 mi; longest timeline: 2 years.
- Where does the information on LA Metro come from?
- The story cites FOX 11 Los Angeles and LA Metro.
On the record
Metro's project page describes the first operating segment as about 8.4 miles between Wilshire/Westwood and G Line/Van Nuys stations and says several location options for the maintenance and storage facility are still to be evaluated
Public record · metro.net
Also reported by