Chelsea Site Gets 76-Unit Tower Filing 41 Days After $33.5M Sale
540 West 29 LLC filed DOB plans for a 14-story, 76-unit Chelsea tower 41 days after paying $33.5M for the assembled West 29th Street site.

- Source Briefing
- Public record
- Also reported by NYC DOB NOW: Build (Socrata)
540 West 29 LLC closed on a three-lot Chelsea assemblage for $33.5 million on September 3, 2026, and six weeks later it was already at the Department of Buildings with plans for what it bought. The buyer filed for a 14-story, 76-unit residential tower on October 14, a 41-day gap between deed and drawings that leaves little doubt the filing was prepared well before the ink on the sale was dry.
Why it matters
A buyer that files new-building plans six weeks after closing was not shopping for a site to sit on. The deed names W29 Owner LLC, tied to PPHE Hotel Group’s Amsterdam office, as the seller of record for 538, 540 and 542-544 West 29th Street, a three-lot hold on Block 700. PPHE runs hotels under the Park Plaza and art’otel brands; its decision to sell this Chelsea block, rather than build on it, handed 540 West 29 LLC an assembled footprint ready for vertical construction with none of the multi-year site-stitching that usually precedes a filing like this one. For operators watching Chelsea’s west side, the short gap is the signal: the capital and the permit work were lined up before the deed recorded.
The news that moved today. Free email. Every weekday morning.
The numbers
The ACRIS deed puts the price at $33.5 million for the combined lots 55, 56 and 57. The DOB NOW filing, job number M01448586-I1, describes a “PROPOSED 14 STORY NB RESIDENTIAL BUILDING” with 76 dwelling units, filed October 14 and currently sitting in Pending Plan Examiner Assignment, the queue before DOB staff reviews the plans. Forty-one days separates the September 3 closing from the October 14 filing date.
What’s next
The filing’s current status, pending plan examiner assignment, means DOB has not yet reviewed the drawings; initial cost on the filing reads as a placeholder pending that review, standard for a job at this stage. The next milestone to watch is plan examination and permit issuance, which will set a real timeline for when 540 West 29 LLC can break ground on the site. Until then, the 41-day turnaround stands as the clearest evidence yet that this was a pre-packaged deal, not a speculative buy.
More: /markets/new-york/
Quick answers
- What is the latest on 540 West 29 LLC in New York?
- 540 West 29 LLC filed DOB plans for a 14-story, 76-unit Chelsea tower 41 days after paying $33.5M for the assembled West 29th Street site.
- What are the key numbers for 540 West 29 LLC?
- Assemblage price: $33.5M; Deed to filing: 41 days; Planned units: 76; Planned stories: 14.
- Where does the information on 540 West 29 LLC come from?
- The story cites NYC ACRIS (Dept. of Finance) and NYC DOB NOW: Build (Socrata).
On the record
W29 Owner LLC, tied to PPHE Hotel Group's Amsterdam office, sold the assembled West 29th Street parcel to 540 West 29 LLC for $33.5 million on September 3, 2026
Public record · a836-acris.nyc.gov
Primary record
- Public record540 West 29 LLC filed DOB NOW plans for a 14-story, 76-unit new building on October 14, 2026, 41 days after the deed closedView the record on data.cityofnewyork.us
Also reported by
- NYC DOB NOW: Build (Socrata)Job filing M01448586-I1, 540 West 29th Street