ICA Miami Taps Gensler to Renovate Second Design District Building
ICA Miami hired Gensler to convert a 30,000 sf building steps from its Design District home, backed by a $40M private campaign and a late 2027 opening.

- Source Briefing
- Read original source · The Art Newspaper
The Institute of Contemporary Art, Miami has selected Gensler to renovate a second building in the Miami Design District, The Art Newspaper reported on November 5. The building sits steps from the museum’s current venue.
Why it matters
A museum doubling its footprint is a long-term commitment to the Design District, not a pop-up. The 30,000 sf property was previously home to the De la Cruz Collection, a private museum that shut after Rosa de la Cruz, one of its two founders, died in 2024. ICA Miami purchased it later that year and has mostly used it for educational programs.
The news that moved today. Free email. Every weekday morning.
For developers watching nearby sites, the signal is a nonprofit anchor funding its own growth with private money rather than public subsidy. Cultural programming tends to support foot traffic for retail, hospitality and residential neighbors, though the report does not quantify any such effect.
The design brief is substantial. Gensler’s design puts eight new galleries on the first and second floors, among them the museum’s first permanent home for a collection of more than 2,000 works. The third floor is reserved for public programs. Outside, the plan adds a facade with transparent elements, a new lobby, and outdoor social areas that include a sculpture deck and a larger cafe.
Museum director Alex Gartenfeld said: “The building was developed to house a contemporary art collection.”
The numbers
- 30,000 sf of exhibition and public-programming space, which the report says doubles the museum’s current capacity.
- $40M capital campaign, supported entirely by private funds.
- $25M paid to acquire the building in 2024, per The Art Newspaper.
- Opening targeted for late 2027, as the museum marks its tenth anniversary at its current location.
What’s next
The building will close once construction begins, and the opening is targeted for late 2027. The report does not give a construction start date, a contractor or a permit timeline, so the schedule for any street-level disruption nearby is unknown.
Developers with adjacent holdings should watch for building permit filings and any right-of-way requests that would show when work begins. We will track the filings. For more local coverage, see South Florida.
Quick answers
- What is the latest on Institute of Contemporary Art, Miami in South Florida?
- ICA Miami hired Gensler to convert a 30,000 sf building steps from its Design District home, backed by a $40M private campaign and a late 2027 opening.
- What are the key numbers for Institute of Contemporary Art, Miami?
- Second building: 30,000 sf; Capital campaign: $40M; 2024 purchase: $25M; Target opening: Late 2027.
- Where does the information on Institute of Contemporary Art, Miami come from?
- The story cites The Art Newspaper.
Sources
Also reported by
- The Art NewspaperICA Miami taps Gensler to renovate new building